YILIN FIRSATI ! ESKİŞEHİR KONYA YOLUNA 500 METRE CEPHELİ
%50 SANAYİ İMARLI (HER TÜRLÜ SANAYİ VE TİCARİ FAALİYETE UYGUN)
H:MAX (YÜKSEKLİK SERBEST) İNŞAAT YÜKSELİK SINIRI BULUNMAMAKTADIR.
ARAZİNİN HEMEN YANINA TOKİ 5 BLOKLUK 100 KONUTLUK İNŞAATA BAŞLAMAKTADIR.
YILIN EN BÜYÜK YATIRIM FIRSATLARINDAN BİRİDİR.HEM YATIRIM HEM İŞ KURMAYA SON DERECE UYGUNDUR.
AL-SAT YAPILABİLİR VEYA YATIRIM PROJELERİ GELİŞTİRİLEBİLİR.
İFRAZ EDİLİP KÜÇÜK PARSELLERE BÖLÜNEBİLİR .
1/1000 İMARI TAMAMLANMIŞTIR.İNŞAAT YAPILABİLİR.
TAKAS TEKLİFLERİ DEĞERLENDİRİLEBİLİR, ARACILARA KOMİSYON ÖDEMESİ GERÇEKLEŞTİRİLİR.
DAHA DETAYLI BİLGİ İÇİN BİZİ ARAYABİLİRSİNİZ.
ALTYAPI OLARAK:
SU : 70 METREDEN SANİYEDE 30 LİTRE SU ALINMAKTADIR. 108 TON / SAAT
DOĞAL GAZ : DOĞALHAZ HATLARI ARAZİNİN ÖNÜNDE BULUNMAKTADIR. KAPASİTE 13.000 m3/ SAAT
ELEKTRİK : TEİAŞ'A AİT İNDİRİCİ MERKEZDE KULLANILABİLİR KAPASİTE 30 MVA. İŞLETMEYE ÖZEL HÜCRE TAHSİSİ MÜMKÜN VE ENERJİ DALGALANMALARINDAN KORUNACAK ŞEKİLDE İŞLETMEYE ÖZEL OLARAK DONATILABİLİR.
HAFRİYAT PROBLEMİ YOKTUR İNŞAAT YAPILACAK ALAN DÜZDÜR.
DAHA FAZLA BİLGİ İÇİN BİZİ ARAYABİLİRSİNİZ
DEAL OF THE YEAR! 500-METER-LONG SIDE OF THE LAND IS IMMEDIATELY ADJACENT TO THE ESKİŞEHİR-KONYA ROAD.
50% INDUSTRIAL ZONED (SUITABLE FOR ANY INDUSTRIAL OR BUSINESS PURPOSES)
HMAX (HEIGHT LIMIT) THERE IS NO HEIGHT RESTRICTION FOR CONSTRUCTION.
TOKİ (HOUSING DEVELOPMENT ADMINISTRATION OF THE REPUBLIC OF TÜRKİYE) IS STARTING A CONSTRUCTION PROJECT COMPOSED OF 5 BUILDINGS AND 100 APARTMENTS IMMEDIATELY ADJACENT TO THE LAND.
ONE OF THE GREATEST INVESTMENT OPPORTUNITIES OF THE YEAR. PERFECTLY SUITABLE FOR BOTH INVESTMENT AND BUSINESS PURPOSES.
SUITABLE FOR TRADING OR INVESTMENT PROJECTS CAN BE PREPARED
CAN BE SUBDIVIDED; SMALLER PARCELS CAN BE CREATED FROM THE LAND.
1/1000 ZONING OF THE LAND HAS BEEN COMPLETED. READY FOR CONSTRUCTION.
OPEN FOR EXCHANGE OFFERS. COMMISSION WILL BE PAID TO INTERMEDIATES.
CONTACT US FOR MORE INFORMATION.
INFRASTRUCTURE INFORMATION:
WATER : THERE IS A WATER SUPPLY OF 30 LITERS PER SECOND AT 70 METERS DEPTH. CAPACITY: 108 TONS / HOUR
NATURAL GAS: THERE ARE NATURAL GAS LINES IMMEDIATELY ADJACENT TO THE LAND. CAPACITY: 13,000 m3/ HOUR
ELECTRIC: TEİAŞ’S (TURKISH ELECTRICITY TRANSMISSION CORPORATION) STEP-DOWN TRANSFORMER STATION CAN BE USED. CAPACITY: 30 MVA. ACCORDING TO THE NEEDS OF THE ENTERPRISE, A MODULAR CELL PROTECTED AGAINST ENERGY FLUCTUATIONS CELL CAN BE ALLOCATED TO THE LAND.
THERE IS NO EXCAVATION PROBLEM. THE CONSTRUCTION SITE IS A FLAT AREA.
PLEASE FEEL FREE CONTACT US FOR MORE INFORMATION